Embedded Systems Development
- Home
- Embedded Systems Development

Embedded Systems Development Provided by BMS-PROJECTS
What We Offer
Our Embedded Systems Development Services Include:
-
// Custom Embedded Hardware Design
Our engineers design embedded hardware from the ground up, ensuring that each component and layout meets project-specific requirements for functionality, performance, and durability. We develop both low-power and high-power electronics to cater to applications across industries, from IoT to industrial automation.
-
// Firmware and Software Development
We develop robust and efficient firmware, optimized for the hardware to ensure seamless and stable operation. Our team is skilled in a variety of programming languages and platforms, enabling us to create software that meets functional and performance specifications while being resource-efficient.
-
// Microcontroller and Microprocessor-Based Systems
From simple microcontroller-based designs to complex microprocessor-based systems, we specialize in developing solutions that meet exact processing and power requirements. Our team is experienced with major platforms, including ARM Cortex, AVR, STM32, and more.
-
// Real-Time Operating Systems (RTOS)
For applications requiring precise timing and responsiveness, we develop real-time systems using RTOS. Our team is experienced with popular RTOS platforms like FreeRTOS, VxWorks, and embedded Linux, ensuring the high reliability and efficiency needed in critical applications.
-
// IoT and Wireless Connectivity Solutions
We design embedded systems with IoT and wireless connectivity in mind, including support for protocols like Wi-Fi, Bluetooth, Zigbee, and LoRa. Our IoT solutions enable remote monitoring, control, and data collection, making them ideal for smart home, industrial IoT, and wearable applications.
-
// Power Management and Battery Optimization
For portable and energy-sensitive applications, we provide solutions focused on efficient power management. Our designs minimize power consumption, extend battery life, and ensure optimal performance for battery-operated devices.
-
// Sensor Integration and Data Acquisition
We specialize in integrating a variety of sensors to enable real-time data acquisition and processing. Our expertise includes working with temperature, pressure, humidity, motion, and optical sensors, making our solutions suitable for monitoring, control, and automation applications.
-
// Embedded Security
Security is a top priority in embedded systems, especially for connected devices. We implement robust security features, including data encryption, secure boot, and secure firmware updates, to protect against cyber threats and ensure data integrity.
Embedded Systems Testing and Validation:
-
// Hardware-In-The-Loop (HIL) Testing
Our HIL testing solutions enable real-time testing of embedded systems in simulated environments, allowing us to validate and optimize system performance under various operating conditions.
-
// Functional and Compliance Testing
Each system undergoes rigorous functional testing to verify that it meets the desired specifications. We also ensure compliance with relevant industry standards, such as CE, FCC, and ISO, to guarantee product safety and quality.
-
// Environmental and Stress Testing
To ensure durability and reliability, we conduct environmental tests including temperature, humidity, and vibration testing, ensuring systems perform as expected in harsh conditions.
-
// Field Testing and Deployment Support
We support clients through field testing, ensuring the embedded system functions reliably in real-world applications. Our deployment support includes troubleshooting and optimization to ensure seamless integration and operation.
Industries We Serve:
-
// Automotive
Advanced driver assistance systems (ADAS), engine control units (ECU), and in-car infotainment.
-
// Industrial Automation
Embedded control systems for machinery, robotics, and process automation.
-
// Consumer Electronics
Wearable technology, smart home devices, and electronic appliances.
-
// Healthcare and Medical Devices
Monitoring devices, portable diagnostic tools, and patient-care equipment.
-
// Energy and Utilities
Renewable energy control systems, power management, and smart metering solutions.
Our Work Flow
Strategy & Planning


Design & Theming
Development & Integration


Testing
Delivery

Testimonial From
Our Clients
Ramesh Prabhu
Ramesh Prabhu
Sheljid Aliyar
Sheljid Aliyar
Client Feedback
Ezhil Deivalakshmi2024-05-16 Thanks to BMS Power for creating a responsive website for our business. Our website looks great on all devices, and we have noticed an increase in traffic and engagement since the launch. Great job. RAGHUL T2024-05-16 BMS Power created an outstanding website design for us. Our vision was perfectly captured by them and they delivered a website that exceeded our expectations. Working with the team was an enjoyable experience, as they were professional, responsive, and helpful. Franklin Silvester2024-05-16 I have worked with BMS Power on multiple projects in London, including website design, website development, and mobile app development. Each time, they have exceeded my expectations with their professionalism, expertise, and attention to detail. I highly recommend their services to anyone looking to enhance their online presence. Athiban2024-05-16 BMS Power provides the best iOS app development services in London. Their team of developers created an iOS app for my business that is sleek, efficient, and easily usable. Highly recommend. Padmaja kamarthi2024-05-15 The BMS Power company offers a variety of customized mobile app solutions in London that are improved to your business requirements. I was able to get an app that perfectly met my specifications with their assistance in understanding my requirements. Raja T2024-05-15 BMS Power's expertise in Android app development in London. They developed an Android app for my business that is intuitive, fast, and visually appealing. I'm extremely satisfied with their work. madhavan madhavan2024-05-15 I was impressed by BMS Power to develop a mobile application, and I am extremely satisfied with the results. As a result, they were able to produce an application that is user-friendly and performs exceptionally well. I would benefit from their services for the development of mobile applications. Nive Thetha2024-05-10 BMS Power Company is a professional web design company in London committed to delivering results. As a result of their understanding of my vision, they were able to create a website that represents my brand beautifully. My satisfaction with the outcome is great. Sinduja Chandran2024-05-10 My website looks great and functions well on all devices thanks to BMS Power's responsive web design services in London. As a result of their responsiveness to my needs, I was able to produce a website that looks fantastic on desktops, tablets, and mobile devices. Arunmozhivarman2024-04-15 My expectations were exceeded when I engaged BMSPOWER for a critical mobile app project. We were impressed by their team's deep technical expertise and understanding of our London business needs. A great deal of attention was paid to details throughout the process, from wireframes to deployment. I was impressed by the quality of the app they delivered. It is robust, user-friendly, and aesthetically pleasing. All deadlines were met, and their communication was transparent.