Low Power Electronics Design
- Home
- Low Power Electronics Design

Low Power Electronics Design Services
What We Offer
Our Low Power Electronics Design Services Include:
-
// Battery-Operated Device Design
We specialize in designing ultra-low power circuits for battery-powered applications, ensuring minimal power draw to extend battery life. Our designs incorporate power-efficient components and optimized circuit architecture for portable devices such as wearables, remote sensors, and medical devices.
-
// Energy Harvesting Solutions
For applications that require sustainable energy sources, we design circuits that harness ambient energy from sources like solar, thermal, and vibration. Our energy harvesting solutions enable the deployment of electronics in remote or off-grid environments with minimal reliance on traditional power sources.
-
// Power Management IC (PMIC) Integration
Effective power management is essential in low power designs. We integrate advanced Power Management ICs (PMICs) into our designs to dynamically manage power distribution, optimize voltage levels, and enable power-saving modes. This approach maximizes energy efficiency and prolongs battery life.
-
// Low Power Microcontroller (MCU) and FPGA-Based Designs
Our engineers are experienced in working with low power microcontrollers (such as ARM Cortex-M series) and FPGAs, which are optimized for low power applications. We design systems that leverage sleep modes, low-power peripherals, and efficient processing capabilities to minimize energy consumption.
-
// Wireless and IoT Connectivity Solutions
Connectivity is essential for IoT and smart devices, but wireless communication can be power-intensive. We design low power connectivity solutions using protocols like BLE (Bluetooth Low Energy), Zigbee, LoRa, and NB-IoT, ensuring that devices remain connected with minimal energy usage.
-
// Analog and Mixed-Signal Design for Low Power Applications
BMS-PROJECTS excels in designing low power analog and mixed-signal circuits, such as signal conditioning, ADCs, DACs, and low-noise amplifiers. These circuits are optimized to consume minimal power while maintaining signal integrity and precision in applications like sensor interfaces and data acquisition systems.
-
// Sensor Integration and Interface Design
We design low-power interfaces for integrating sensors in various applications, including environmental monitoring, healthcare, and industrial automation. Our designs ensure that sensor data is accurately captured and transmitted while keeping power consumption low.
-
// Power Supply Design for Low Voltage and Low Current
We develop power supplies specifically designed for low voltage, low current applications, such as wearables, portable devices, and IoT sensors. Our designs prioritize efficiency and stability, delivering reliable performance in compact form factors.
Design and Development Process:
-
// Circuit Design Optimization for Low Power
We begin by optimizing circuit design to ensure that every component and connection minimizes power consumption. Our engineers use low power design techniques, including minimizing leakage current, duty cycling, and component selection to reduce overall power draw.
-
// Power Consumption Analysis and Profiling
Understanding power requirements is crucial for low power design. We conduct detailed power profiling and analysis, identifying the power consumption of each subsystem under different conditions. This allows us to optimize power usage based on the operational profile of the device.
-
// PCB Layout for Low Power Efficiency
Our PCB layouts are carefully optimized to reduce power losses and electromagnetic interference (EMI). We design multi-layer PCBs with short, low-inductance traces and effective grounding to minimize power losses and enhance overall efficiency.
-
// Thermal Management for Low Power Devices
While low power devices typically generate less heat, effective thermal management is still essential for reliability, especially in compact, sealed enclosures. We implement passive cooling and efficient component placement to maintain safe operating temperatures.
-
// Testing and Validation for Low Power Consumption
We perform rigorous testing to validate that devices meet low power targets under real-world conditions. Our testing includes power consumption measurements, environmental testing, and performance validation to ensure reliable operation across various usage scenarios.
-
// Compliance with Low Power Standards
Many low power applications, such as medical and communication devices, must meet specific regulatory standards. BMS-PROJECTS ensures compliance with industry standards like FCC, CE, and IEC, as well as any specific power consumption requirements for energy-efficient devices.
Industries We Serve:
-
// Consumer Electronics
Low power design for wearables, smartwatches, and portable electronics.
-
// Healthcare and Medical Devices
Energy-efficient solutions for portable medical devices, remote monitoring, and diagnostics.
-
// Internet of Things (IoT)
Low power sensors, actuators, and controllers for smart homes, agriculture, and environmental monitoring.
-
// Industrial Automation
Battery-powered sensors, monitoring systems, and controllers for industrial and manufacturing applications.
-
// Smart Home and Building Automation
Low power solutions for smart thermostats, security sensors, and lighting control systems.
Our Work Flow
Strategy & Planning


Design & Theming
Development & Integration


Testing
Delivery

Testimonial From
Our Clients
Ramesh Prabhu
Ramesh Prabhu
Sheljid Aliyar
Sheljid Aliyar
Client Feedback
Ezhil Deivalakshmi2024-05-16 Thanks to BMS Power for creating a responsive website for our business. Our website looks great on all devices, and we have noticed an increase in traffic and engagement since the launch. Great job. RAGHUL T2024-05-16 BMS Power created an outstanding website design for us. Our vision was perfectly captured by them and they delivered a website that exceeded our expectations. Working with the team was an enjoyable experience, as they were professional, responsive, and helpful. Franklin Silvester2024-05-16 I have worked with BMS Power on multiple projects in London, including website design, website development, and mobile app development. Each time, they have exceeded my expectations with their professionalism, expertise, and attention to detail. I highly recommend their services to anyone looking to enhance their online presence. Athiban2024-05-16 BMS Power provides the best iOS app development services in London. Their team of developers created an iOS app for my business that is sleek, efficient, and easily usable. Highly recommend. Padmaja kamarthi2024-05-15 The BMS Power company offers a variety of customized mobile app solutions in London that are improved to your business requirements. I was able to get an app that perfectly met my specifications with their assistance in understanding my requirements. Raja T2024-05-15 BMS Power's expertise in Android app development in London. They developed an Android app for my business that is intuitive, fast, and visually appealing. I'm extremely satisfied with their work. madhavan madhavan2024-05-15 I was impressed by BMS Power to develop a mobile application, and I am extremely satisfied with the results. As a result, they were able to produce an application that is user-friendly and performs exceptionally well. I would benefit from their services for the development of mobile applications. Nive Thetha2024-05-10 BMS Power Company is a professional web design company in London committed to delivering results. As a result of their understanding of my vision, they were able to create a website that represents my brand beautifully. My satisfaction with the outcome is great. Sinduja Chandran2024-05-10 My website looks great and functions well on all devices thanks to BMS Power's responsive web design services in London. As a result of their responsiveness to my needs, I was able to produce a website that looks fantastic on desktops, tablets, and mobile devices. Arunmozhivarman2024-04-15 My expectations were exceeded when I engaged BMSPOWER for a critical mobile app project. We were impressed by their team's deep technical expertise and understanding of our London business needs. A great deal of attention was paid to details throughout the process, from wireframes to deployment. I was impressed by the quality of the app they delivered. It is robust, user-friendly, and aesthetically pleasing. All deadlines were met, and their communication was transparent.