Modernize Legacy Software Services
- Home
- Modernize Legacy Software Services

Modernize Legacy Software Services Provided by BMS-PROJECTS
What We Offer
Legacy System Assessment
-
Service Overview:
Before embarking on any modernization project, we conduct a thorough assessment of your existing legacy systems. This includes evaluating the current architecture, identifying bottlenecks, and understanding the business processes tied to the system.
-
Benefits:
A clear understanding of your system's strengths and weaknesses, informed decision-making, and a solid foundation for the modernization project.
Application Re-Engineering
-
Service Overview:
BMS-PROJECTS specializes in re-engineering legacy applications to improve functionality, enhance performance, and align with modern standards. This service involves refactoring code, updating system architecture, and incorporating new technologies.
-
Benefits:
Improved application performance, enhanced maintainability, and extended system lifespan without the need for complete replacement.
Legacy to Cloud Migration
-
Service Overview:
We offer comprehensive cloud migration services that transition legacy systems to cloud-based platforms. This service includes re-hosting, re-platforming, or even re-architecting your applications to fully leverage the benefits of cloud computing.
-
Benefits:
Increased scalability, improved system availability, reduced infrastructure costs, and enhanced disaster recovery capabilities.
API Integration & Modernization
-
Service Overview:
To ensure that your legacy systems can integrate with modern applications, we develop and implement APIs that bridge the gap between old and new technologies. This allows legacy systems to communicate effectively with modern platforms and tools.
-
Benefits:
Seamless integration with modern systems, improved data flow, and extended utility of legacy applications.
User Interface (UI) Modernization
-
Service Overview:
Modernizing the user interface of legacy applications is key to improving user experience and productivity. We redesign outdated interfaces to be more intuitive, user-friendly, and aligned with current design standards.
-
Benefits:
Enhanced user satisfaction, increased efficiency, and reduced training time for new users.
Database Modernization
-
Service Overview:
Outdated databases can slow down operations and limit the scalability of your applications. We offer database modernization services that include migrating to modern database platforms, optimizing performance, and ensuring data integrity.
-
Benefits:
Improved data management, enhanced performance, and better support for advanced data analytics.
Technology Stack Upgrade
-
Service Overview:
We upgrade the technology stack of legacy applications to incorporate modern programming languages, frameworks, and tools. This ensures that your applications are built on a robust, future-proof foundation.
-
Benefits:
Enhanced system reliability, easier maintenance, and the ability to leverage the latest technological advancements.
Legacy System Integration
-
Service Overview:
For businesses that need to maintain their legacy systems while integrating new solutions, we offer seamless integration services. We ensure that your legacy systems can work alongside modern applications, enabling a gradual and controlled modernization process.
-
Benefits:
Smooth transition to modern systems, minimal disruption to operations, and extended life of legacy applications.
Security Enhancement
-
Service Overview:
Legacy systems often suffer from outdated security measures, making them vulnerable to modern threats. We upgrade the security protocols of your legacy software, ensuring compliance with current security standards and protecting your data from breaches.
-
Benefits:
Enhanced protection against cyber threats, compliance with regulations, and improved trust with clients and partners.
Legacy System Decommissioning
-
Service Overview:
When it's time to retire a legacy system, we manage the decommissioning process to ensure that data is securely transferred and preserved, and that the transition to new systems is smooth and well-coordinated.
-
Benefits:
Secure data migration, reduced operational risks, and streamlined transition to modern systems.
Performance Optimization
-
Service Overview:
We offer performance optimization services for legacy software, including code refactoring, database tuning, and infrastructure upgrades. These improvements help to ensure that your systems run efficiently, even under increased workloads.
-
Benefits:
Faster application performance, reduced downtime, and improved user experience.
Training & Support
-
Service Overview:
Modernizing legacy software often requires changes in how employees interact with the system. We provide comprehensive training and ongoing support to ensure that your team can effectively use the modernized software.
-
Benefits:
Smooth transition to new systems, increased user confidence, and reduced operational disruptions.
Cost Analysis & ROI Assessment
-
Service Overview:
We conduct detailed cost analysis and return on investment (ROI) assessments for legacy system modernization projects. This helps businesses understand the financial benefits of modernization and make informed decisions about their technology investments.
-
Benefits:
Clear understanding of modernization costs, justified investment decisions, and maximized ROI.
Our Work Flow
Strategy & Planning


Design & Theming
Development & Integration


Testing
Delivery

Testimonial From
Our Clients
Ramesh Prabhu
Ramesh Prabhu
Sheljid Aliyar
Sheljid Aliyar
Client Feedback
Ezhil Deivalakshmi2024-05-16 Thanks to BMS Power for creating a responsive website for our business. Our website looks great on all devices, and we have noticed an increase in traffic and engagement since the launch. Great job. RAGHUL T2024-05-16 BMS Power created an outstanding website design for us. Our vision was perfectly captured by them and they delivered a website that exceeded our expectations. Working with the team was an enjoyable experience, as they were professional, responsive, and helpful. Franklin Silvester2024-05-16 I have worked with BMS Power on multiple projects in London, including website design, website development, and mobile app development. Each time, they have exceeded my expectations with their professionalism, expertise, and attention to detail. I highly recommend their services to anyone looking to enhance their online presence. Athiban2024-05-16 BMS Power provides the best iOS app development services in London. Their team of developers created an iOS app for my business that is sleek, efficient, and easily usable. Highly recommend. Padmaja kamarthi2024-05-15 The BMS Power company offers a variety of customized mobile app solutions in London that are improved to your business requirements. I was able to get an app that perfectly met my specifications with their assistance in understanding my requirements. Raja T2024-05-15 BMS Power's expertise in Android app development in London. They developed an Android app for my business that is intuitive, fast, and visually appealing. I'm extremely satisfied with their work. madhavan madhavan2024-05-15 I was impressed by BMS Power to develop a mobile application, and I am extremely satisfied with the results. As a result, they were able to produce an application that is user-friendly and performs exceptionally well. I would benefit from their services for the development of mobile applications. Nive Thetha2024-05-10 BMS Power Company is a professional web design company in London committed to delivering results. As a result of their understanding of my vision, they were able to create a website that represents my brand beautifully. My satisfaction with the outcome is great. Sinduja Chandran2024-05-10 My website looks great and functions well on all devices thanks to BMS Power's responsive web design services in London. As a result of their responsiveness to my needs, I was able to produce a website that looks fantastic on desktops, tablets, and mobile devices. Arunmozhivarman2024-04-15 My expectations were exceeded when I engaged BMSPOWER for a critical mobile app project. We were impressed by their team's deep technical expertise and understanding of our London business needs. A great deal of attention was paid to details throughout the process, from wireframes to deployment. I was impressed by the quality of the app they delivered. It is robust, user-friendly, and aesthetically pleasing. All deadlines were met, and their communication was transparent.